Construction Demolition Daily Safety Checklist

Comprehensive demolition daily safety checklist covering OSHA 1926 Subpart T demolition requirements.

  • Industry: Construction
  • Frequency: Daily
  • Estimated Time: 15-20 minutes
  • Role: Demolition Supervisor/Competent Person
  • Total Items: 25
  • Compliance: OSHA 1926.850-860, EPA Regulations, Local Building Codes

Engineering Survey

Pre-demolition

  • Engineering survey on file?
  • Survey current for today's work area?

Utilities

Utility control

  • All utilities disconnected?
  • Disconnection verified with utility companies?

Structural Stability

Building condition

  • Remaining structure stable?
  • Floor openings protected/barricaded?
  • Unsupported walls properly braced?

Hazardous Materials

Asbestos/lead

  • Hazmat survey completed?
  • Hazardous materials removed prior to demolition?

Debris Handling

Waste management

  • Debris chutes secured?
  • Debris removal current?
  • Dust control measures in place?

Hazardous Materials Survey

Verify hazardous material assessment before demolition

  • Asbestos survey completed and reviewed?
  • Lead paint assessment completed?
  • All required abatement completed before work?
  • Air monitoring in place if required?

Structural Stability & Safety

Verify structural stability during demolition operations

  • Engineering demolition plan followed?
  • Exclusion zones established and barricaded?
  • All utilities disconnected and verified?
  • Structural stability assessed before each phase?
  • Site Supervisor Signature

Worker Protection & PPE

Worker safety during demolition operations

  • All workers wearing required demolition PPE?
  • Respiratory protection in use where required?
  • Hearing protection provided and worn?
  • Site perimeter secured with barricades?

Related Construction Checklists

Related Demolition Checklists

Why Use This Construction Demolition Daily Safety Checklist?

This construction demolition daily safety checklist helps construction teams maintain compliance and operational excellence. Designed for demolition supervisor/competent person professionals, this checklist covers 25 critical inspection points across 8 sections. Recommended frequency: daily.

Ensures compliance with OSHA 1926.850-860, EPA Regulations, Local Building Codes. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the Construction Demolition Daily Safety Checklist cover?

This checklist covers 25 inspection items across 8 sections: Engineering Survey, Utilities, Structural Stability, Hazardous Materials, Debris Handling, Hazardous Materials Survey, Structural Stability & Safety, Worker Protection & PPE. It is designed for construction operations and compliance.

How often should this checklist be completed?

This checklist should be completed daily. Each completion takes approximately 15-20 minutes.

Who should use this Construction Demolition Daily Safety Checklist?

This checklist is designed for Demolition Supervisor/Competent Person professionals in the construction industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists