HSE PUWER Work Equipment Inspection UK - FREE PDF

Work equipment inspection per PUWER 1998 requirements. Verify equipment is suitable, maintained, inspected, and has appropriate guards and controls. Required for all employers in Great Britain.

  • Industry: Manufacturing
  • Frequency: Annual / As required
  • Estimated Time: 30-45 minutes
  • Role: Competent Person / Maintenance Manager
  • Total Items: 29
  • Compliance: PUWER 1998, LOLER 1998, HSE PUWER Guidance

Suitability

Reg 4 - Equipment suitable for use

  • Equipment suitable for intended purpose?
  • Suitable for conditions of use?
  • Ergonomic factors considered?

Maintenance

Reg 5-6 - Maintenance and inspection

  • Equipment maintained in efficient working order?
  • Maintenance log up to date?
  • Statutory inspections current (where required)?
  • Inspection records available?

Guards & Protection

Reg 11-13 - Dangerous parts

  • Guards fitted to dangerous parts?
  • Guards prevent access to danger zones?
  • Guard interlocks functioning?
  • Nip points protected?
  • Rotating projections enclosed?

Controls & Stop Devices

Reg 14-18 - Controls

  • Controls clearly identified?
  • Controls located to avoid accidental operation?
  • Start control requires deliberate action?
  • Stop control accessible and functional?
  • Emergency stop readily accessible?
  • Means to isolate from power sources?

Other Requirements

Additional PUWER requirements

  • Equipment stable during use?
  • Adequate lighting provided?
  • Appropriate warnings/markings displayed?
  • Protection from extreme temperatures?
  • Users adequately trained?
  • Equipment Status
  • Defects/Actions Required

Initial Safety Assessment

Preliminary safety and compliance verification

  • Work area safe and hazard-free?
  • Required PPE available and in good condition?
  • Emergency exits clear and marked?
  • First aid supplies accessible?

Related Safety Checklists

Why Use This HSE PUWER Work Equipment Inspection UK?

This hse puwer work equipment inspection uk helps manufacturing teams maintain compliance and operational excellence. Designed for competent person / maintenance manager professionals, this checklist covers 29 critical inspection points across 6 sections. Recommended frequency: annual / as required.

Ensures compliance with PUWER 1998, LOLER 1998, HSE PUWER Guidance. Regulatory-aligned for audit readiness and inspection documentation.

Frequently Asked Questions

What does the HSE PUWER Work Equipment Inspection UK cover?

This checklist covers 29 inspection items across 6 sections: Suitability, Maintenance, Guards & Protection, Controls & Stop Devices, Other Requirements, Initial Safety Assessment. It is designed for manufacturing operations and compliance.

How often should this checklist be completed?

This checklist should be completed annual / as required. Each completion takes approximately 30-45 minutes.

Who should use this HSE PUWER Work Equipment Inspection UK?

This checklist is designed for Competent Person / Maintenance Manager professionals in the manufacturing industry. It can be used for self-assessments, team audits, and regulatory compliance documentation.

Can I download this checklist as a PDF?

Yes, this checklist is available as a free PDF download. You can also use it digitally in the POPProbe mobile app for real-time data capture, photo documentation, and automatic reporting.

Browse More Checklists