Weighing And Dispensing Area – Checklist
No.
Question
1
Are the Weighing and Dispensing area separated from other rooms by walls or other partitions and equipped to avoid cross-contamination?
2
Are all the Weighing Utensils cleaned and sterilized, before/after every use?
3
Are all the Weighing Utensils Stored in a secured place to avoid contamination?
4
Are all the Raw Material Containers which will be weighed are cleaned and disinfected before opening it?
5
Are the Containers well sealed after the weighing process complete?
6
After weighing, for each Batch, are all the Raw Materials identified and separated based on their identification data?
7
Are the Scales and Balances used for Weighing, calibrated regularly?
8
Are all the Results of Calibration properly recorded and documented?
9
Are at least two Individual Staff available to verify the correctness of the identity and amount for measured or weighted materials?
10
Is an authorized system available to governing the issuance of Starting Materials, Intermediate, and Bulk products?
11
Are only required Raw Materials, Intermediate, and Bulk Products available in the dispensing area?
12
Are the written procedures available for Handling, Weighing, Counting, and Dispensing Raw Materials?
13
Are the written procedures available for Handling, Weighing, Counting, and Dispensing Packaged Products?
14
Before Weighing and Dispensing are all the Container of Raw Materials checked for proper Labelling, which includes approval from the QC team?
15
Are all the dispensed Raw Materials, Intermediate, and Bulk Products rechecked for accuracy, and signed by the supervisor, before sending those to Production?
16
Are all the unused Raw Materials, Packing Materials, Intermediate, and Bulk Products will be returned to storage only after proper documentation and reconciliation?
17
Are the return to Storage of all the unused Raw Materials, Packing Materials, Intermediate, and Bulk Products will be rejected if any mismatch in the reconciliation occurs?
18
Are adequate Staff available in the Weighing and Dispensing area?
19
Are the proper supervision available for the Weighing and Dispensing area?
20
Are all the staff of the Weighing and the Dispensing area got the required and updated Training?
21
Are all the Personnel available at the Weighing and Dispensing area wearing protective clothing and equipment(Uniforms, Gloves, Mask, etc.)?
22
Are adequate Light Fitting, Pipework, Ventilation, and Other Services available and functional in the Weighing and Dispensing area?
23
Do the required Humidity, Temperature, etc. maintained and recorded for the area?
24
Are there Equipment available and functional to regulate the required Humidity, Temperature, etc.?
25
Are the Weighing and Dispensing area clean and disinfected periodically?