Skip to main content
popprobe logo
No.
Question
Options
1
Check above-ground conductors and cables for adequate supports and protection from physical damage?
Yes
No
N/A
2
Verify that wiring methods and support systems for serviceentrance conductors are suitable?
Yes
No
N/A
3
Check service conductors for adequate size and rating?
Yes
No
N/A
4
Verify that service equipment is identified as suitable for that use?
Yes
No
N/A
5
Verify that service overcurrent protection is provided, properly sized, and part of or adjacent to the disconnecting means?
Yes
No
N/A
6
Verify that service disconnects are grouped together and limited to six in any one location?
Yes
No
N/A
7
Check ratings of service disconnecting means?
Yes
No
N/A