Skip to main content
popprobe logo

Water Distribution

No.
Question
Options
1
Verify that the water distribution system is available for inspection: NOT concealed, NOT covered, NOT put into use.
Yes
No
N/A
2
Confirm that piping material is approved for the water distribution system
Yes
No
N/A
3
Check to be sure that required valves are accessible and are of approved design and materials
Yes
No
N/A
4
Confirm that materials and methods used for joints and connections are approved
Yes
No
N/A
5
Check bends in copper tubing to be sure they have been installed in an approved manner
Yes
No
N/A
6
Identify fixture branches, fixture group mains, water service and branch mains, mains and risers.
Yes
No
N/A
7
Determine water distribution system pressure and height of highest fixture.
Yes
No
N/A
8
Check installed water mains, branch mains and risers to be sure they are correctly sized
Yes
No
N/A
9
Verify that water distribution piping has been supported at required intervals
Yes
No
N/A
10
Check for protection against breakage where piping passes through walls
Yes
No
N/A